Location: Sr17 S / Sugarloaf Rd, Santa Cruz - May 22 2019 7:47PM
: CZP-Assist with Construction
  -- May 22 2019 8:43PM [6] ROAD WORK WILL BE IN THE SOUTHBOUND LANES OF SR-17 BETWEEN GLENWOOD CUTT-OFF AND VINE HILL ROAD.
SOUTHBOUND SR-17 TRAFFIC WILL BE UTILIZING THE NORTHBOUND #1 LANE OF SR-17 AT GLENWOOD CUTT-OFF AND WILL BE DIVERETED BACK TO THE SOUTHBOUND SIDE AT VINE HILL ROAD.
  -- May 22 2019 8:45PM [7] NB AND SB TRAFFIC SIGNS TO READ SLOW OR STOPPED TRAFFIC AHEAD
  -- May 22 2019 8:45PM [8] 1039 TMC
Comments powered by